2021
CLIENT: BWM Srl
Pre-feasibility for a sustainable composting facility in Taviano (LE), developed with CAT 24 architects to treat 60 t/d of organic waste. The design respects landscape and heritage, featuring rainwater harvesting, sustainable materials, a green roof, and visitor areas with circular windows. A participatory approach was planned after stakeholder analysis, addressing community concerns from past facility failures. Project currently on hold.